Corporate headquarters in Pinneberg: office building with slate facade and red window bands

CORPORATE HEADQUARTERS

CONFERENCE FLOOR, FIRE SAFETY UPGRADE AND MODERNIZATION
LOCATION:PINNEBERG
TYPE:ADMINISTRATION BUILDING
AREA:5,200 M² GFA
CONSTRUCTION:2000 – 2007
After 30 years of intensive use, extension, and structural alteration, the classically modern administration building of a diversified agricultural group, dating from the 1970s and 1980s, was to undergo a comprehensive technical review, with the aim of a substantial functional, technical, and design renewal.
Headquarters entrance with a red portal between stone facades
The particular focus here was on fire safety, a detailed analysis of the building services, the reorganization of the offices, and the design.
Office with meeting table and timber built-in, glass door to the roof terrace
Building on the results of our analysis of the existing fabric and its problems, we developed a detailed program of requirements in several variants that sets out alternative cost-benefit calculations transparently.
Long facade with stone slabs and red window bands
This preliminary work was the basis for the design and planning work commissioned afterward, which, alongside the comprehensive modernization of the building services, also included a demanding conference floor in the set-back top story.
Conference room with long timber table and black chairs
Both four-story administration buildings were then refurbished according to the specifications of the maximum variant of the program of requirements, and their interiors were fundamentally renewed and redesigned.
Reception area with desk, timber-paneled wall and marble floor
The set-back top story, previously used as a shareholder apartment, was largely removed and replaced by a new story with highly insulated curtain walls of dark Eternit paneling.
Conference floor on the roof with a timber terrace above the gravel roof
Two water-cooled server centers equipped with the latest technology, along with an air-conditioned print center with large-format printers and an automatic envelope-inserting line, were integrated into the buildings in connection with the complete renewal of the data network.
Server room with racks and cabling
In the redesign, particular value was placed on contemporary design, high sustainability figures, and sound functionality. The planning and conversion work was carried out during ongoing operations, with great care and consideration.
Washroom with blue glass wall, timber door and checkerboard floor
Washroom with green glass wall, black tiles and timber door

Project Data

Project

  • TypeAdministration building, corporate headquarters
  • LocationPinneberg

Period

  • Planning, Construction2000 – 2007

Scope

  • Total Area5,200 m² gross floor area
  • Set-back Story250 m² gross floor area
  • HOAI Work Phases1–9

Credits

  • Design, Project ManagementUldis Stoeppler, René Nachtwey, Stoeppler + Stoeppler Architekten BDA
  • Photography–
  • Renderings–