Rendering of the DURAG GROUP plant expansion, Hamburg-Lokstedt: administration building with glazed top floor and flags on the forecourt

DURAG GROUP PLANT EXTENSION

NEW CONSTRUCTION AND CONVERSION OF A CORPORATE HEADQUARTERS FOR ENVIRONMENTAL TECHNOLOGY
LOCATION:HAMBURG-LOKSTEDT
TYPE:PRODUCTION AND ADMINISTRATION BUILDING
AREA:10,450 M² GFA
PLANNING:2011
As part of the expansion planning of a globally operating group that leads the market in environmental measurement and combustion technology, an analysis of the required administrative and production space was carried out in close cooperation with the client, and a differentiated catalog of requirements was developed. Comparing this with the space available on the works site of the DURAG GROUP, and examining possible adaptive reuse, led to the conclusion that the existing spaces would not permit the desired expansion. Together with the client, scenarios ranging from adaptive reuse to new construction at various sites in Hamburg and Schleswig-Holstein were developed and discussed. After the client's final decision, the site on Kollaustraße was to be kept and developed further. In cooperation with Wirtschaftsförderung Hamburg, adjoining properties in the immediate surroundings of the company's site were then acquired for the extension.
Rendering: entrance building with stone facade, glass front and round glass stair tower
The structural and building-code prerequisites for using each of these properties (demolition, clearance of unexploded ordnance, investigation and disposal of legacy contamination, and, among other things, a partial exemption from the applicable land use plan) were created immediately afterward, so that planning of the building extension began after a project development period of about 1.5 years. Closely guided by functional and economic requirements, the desired extension was developed as a transparent and highly energy-optimized building volume using passive house technology. Particular importance was given to weaving the new building into the existing buildings structurally, functionally, and in design terms, so that it fits visibly but harmoniously into the existing structures.
Rendering: existing building with light facade panels and an added glazed story
Site plan of the company grounds on Kollaustraße
Ground-floor plan with production areas
First-floor plan with offices and production
Top-floor plan with offices and canteen
North elevation of the company building
South elevation of the company building

Project Data

Project

  • TypeProduction and administration building
  • LocationHamburg-Lokstedt

Period

  • Planning, Construction2011

Scope

  • Total Area10,450 m² gross floor area
  • HOAI Work Phases1–3

Credits

  • Design, Project ManagementUldis Stoeppler, René Nachtwey
  • Photography–
  • Renderings–