Outdoor ramp at an office campus in Pinneberg: the sunken ramp lit at night in front of the office building

OUTDOOR AREA WITH RAMP

LOCATION:PINNEBERG
TYPE:OUTDOOR AREAS
CONSTRUCTION:2017 – 2018
For the redesign of the outdoor areas of the corporate headquarters of a group of companies operating across Europe, which has been the subject of extensive conversion, extension, and new-construction planning since 2004, a prestigious, barrier-free basement exit was commissioned, with a ramp and a stair leading to the adjacent buildings of the office campus in Pinneberg, Schleswig-Holstein. In its materiality and quality it matches the main buildings.
Sunken entrance with stairs and natural-stone walls set in a gravel bed, lawn and mature trees behind
The implemented design incorporates a gently sloped, wheelchair-accessible, and recessed ramp, flanked on both sides by concrete retaining walls, along with a staircase leading to the delivery area. A meticulously chosen and calculated lighting concept ensures optimal illumination of the ramp path and the exterior staircase.
Barrier-free ramp at dusk, with lights set into the side walls
Top view of the ramp and outdoor stair: the curved, lit ramp path between gravel bed and lawn
Outdoor stair beside the ramp, retaining wall in dark gray exposed concrete with handrail and step lights
View up the ramp between two walls of dark gray exposed concrete, with handrails on both sides
Floor plan of the ramp and stair with grid lines and dimensions
The inner faces of the ramp walls are dark gray exposed concrete; the outer faces and the stair were clad with cleft-faced Otta phyllite slabs left over from earlier conversion work on the building facades and kept for reuse. The walls were cut to fit from dark green marble slabs, likewise taken from stored decorative panels of the main buildings.
Ramp between exposed-concrete walls with recessed lights in the evening, a grating in the foreground
Longitudinal section through the ramp and retaining walls showing the slope and foundations
A carefully chosen and calculated lighting concept ensures good illumination of the ramp path and the outdoor stair.
Ramp to the lower floor in front of the facade of Otta phyllite slabs, with natural-stone wall copings
Office building with a dark natural-stone facade at night, the lit ramp in front

Project Data

Project

  • TypeOutdoor areas, office building
  • LocationPinneberg, Schleswig-Holstein

Period

  • Planning, Construction2017 – 2018

Scope

  • Total Area–
  • HOAI Work Phases1–9

Credits

  • Design, Project ManagementRené Nachtwey
  • Photography–