Theater pavilion of Schloss Erbach-Fürstenau, Michelstadt-Steinbach: white facade with red sandstone surrounds, wrought-iron balcony and slate roof

SCHLOSS ERBACH-FÜRSTENAU

RESTORATION, CONVERSION, AND REFURBISHMENT OF A ROCOCO THEATER PAVILION
LOCATION:MICHELSTADT-STEINBACH, HESSE
TYPE:THEATER PAVILION, STUDIO AND RESIDENCE
AREA:298 M² GFA
CONSTRUCTION:1996 – 1997
The garden pavilion of Schloss Erbach-Fürstenau in Michelstadt-Steinbach, historically used as a theater, was to be fitted out and used as an apartment and studio at the request of the Hamburg artist and professor Eun Nim Ro, after a long period of residential use by the count's family and the years of vacancy that followed.
The pavilion before restoration, by the bridge in dull weather
The vacant pavilion before restoration, behind a construction fence
Damaged base with portal and twisted columns beneath the balcony before restoration
The extensive restoration and conversion work included the refurbishment of the walls and of the floor slab above the base story, both severely damaged by moisture and fungal infestation, the installation of a missing basement floor slab, and the restoration of the external stairs, parapets, and guard railings as well as of the slate covering of the original roof and its dormers.
Former theater room stripped back, with exposed floor joists and a ladder
Roofers laying new slate scales around a dormer
Theater room during restoration with exposed floor and wall panels
Uncovered fragment of a historic wall painting with a mapping grid
The historic ceiling paintings, too, were secured and conserved under the careful and knowing eye of Dr. Lickes, the responsible heritage conservation officer, and with the kind support of the Deutsche Stiftung Denkmalschutz.
Base story with rubble-stone walls and new timber battens on the ceiling
Interior with scaffolding and surveying equipment during the works
Scaffolded pavilion during roof work in winter
Craftsmen on scaffolding in the theater room, historic stucco panels on the wall
The scope of the work also included the restoration of the original windows and doors in keeping with their landmark status, of the typical Baroque ornamentation and stucco work in the interiors, and the careful installation of essential building services equipment.
Conservator securing the historic wall decoration by the window
Restoring the walls, the stair to the attic in the background
The restored pavilion from the front: white facade, red surrounds, slate roof
Side view with studio windows in the arches of the base story
Sandstone outdoor stair with wrought-iron railing, the bridge over the Mümling behind
The base story, originally the passage room to the garden at the level of the briskly flowing river Mümling, was to serve as studio space in the future. The former theater room on what is now the raised ground floor was fitted with room-length manor floorboards as an open loft-like room and redesigned as a living area for living, cooking, and dining.
Former theater room after restoration: marble pilasters, glazing-bar windows, fireplace, plank floor
Along the northern row of windows, the floor plan placed a small open kitchen, an enclosed vestibule, the stair hall, and the new stairs to the attic story. This created a residential floor that has kept the formerly open character of the theater room.
Studio in the base story with arched windows, a timber post and large ink paintings
Studio with black ink paintings on the wall and floor
The attic story is reached by a new oak staircase through the existing opening in the ceiling. Three bedrooms were installed there, along with a full bathroom lined in English stoneware ceramic and a modern, gas-fired condensing boiler plant with hot water production. During the construction and restoration work, the Dieburg architect Claus Giel, an experienced heritage conservation specialist, was available to our office for construction supervision and advice.
Room with fireplace, restored wall panels and an armchair by the window
Loft-like living space with long timber planks and white curtains
The pavilion at dusk with lit windows by the bridge

Project Data

Project

  • TypeHistoric building fabric, studio and residence
  • LocationMichelstadt-Steinbach i. Odenwald, Hesse
  • ClientEun Nim Ro, Hamburg / Seoul

Period

  • Planning, Construction1996 – 1997

Scope

  • Total Area298 m² gross floor area
  • HOAI Work Phases1–9

Credits

  • Design, Project ManagementUldis Stoeppler, Stoeppler + Stoeppler Architekten BDA
  • On-site Construction SupervisionClaus Giel, architect, Dieburg
  • Photography–

Publications

Bausubstanz, Heft 9/1999, Meininger Verlag, Neustadt 1999